Header image  

Design Serge Pennec

Building Lionel Storck

 
  





Empennage.

Go to the stabilator

Go to the Control Linkage Parts and Fittings

Vertical empennage : It consists in two main parts, the vertical stabilizer and the rudder. The vertical stabilizer is made of a spar, a leading edge, ribs and a skin (plywood and fiber glass). The spar is build with stringers (oregon pine) and a core made of plywood.
The leading edge is shaped in a red cedar beam.
The ribs are done in 30mm insulation foam, some reinforced plywood.

Parts making up the vertical stabilizer
Leading edge Spar and leading edge Ribs.
Raw beam
coin C1
Completed
Collage C1
Completed (Tip)
Collage C1

C1

C4

C1

At this point, the ribs are not shaped, they are rectangular to simplify the bonding operation.

Ribs and vertical stabilizer just glued
C1 C1

I used a home made sanding bloc to shape the ribs.

Vertical Stabilizer with its ribs being shaped.
coin C1 Collage C1 C1
coin C1 Collage C1 coin C1
Rib #0 reinforcement
coin C1
Rib #6 reinforcement and spacer
coin C1

coin C1
Rib #2 reinforcment
coin C1

Vertical Stabilizer: Gluing the rigth hand side of the skin.
It's falls now, a bit chilly.
Gluing under a tent.
coin C1
Gluing under a tent.
Welcome home!
C1
coin C1 Collage C1 coin C1 coin C1
Vertical Stabilizer glued.
coin C1 Collage C1 coin C1 coin C1
Yaw.
Structure glued
coin C1
Lower Filler
coin C1
Gluing the Lower filler and stiffener
coin C1
Gluing the left skin
coin C1
With its left Skin
coin C1
Done, front view
coin C1
Lateral view
coin C1

Stabilator : It is made of a spar, a leading edge, ribs and upper and lower surfaces skins (plywood and fiberglass). The spar is made with 2 main spruce caps glued between two plywood shear webs. The leading edge is made of red cedar. The ribs are made from insulation foam (30 and 20mm) some being reinforced using plywood.

Stablilator.
Its parts...
coin C1
1st gluing of the spar
coin C1
1st gluing done
coin C1
Spruce filler between the caps
coin C1
2nd gluing of the spar
coin C1
Spar Carbon gluing
(Applying Pressure with clamps)
coin C1
Carbon glued
(Bonding in stove 55°C)
coin C1
Spar done

coin C1 coin C1
Structure being glued
coin C1
Gluing done
coin C1
Sanding done
coin C1
Leading edge
coin C1

Control Linkage Parts and Fittings: Most part of the fittings and linkage parts are made of aluminium aloy (2017A) and steel (25CD4S/25CrMo4). Water quenching is required for 2017A parts or they crack when bending.

Control Linkage and Fitting: Rudder and Stabilator.
Control Horn. Hinges

coin C1

coin C1 coin C1
Control linkage parts.
coin C1 coin C1 coin C1
coin C1 coin C1 coin C1
Elevator Command Linkage
coin C1 coin C1 coin C1